Fibre
Site & campus backbone
OS2 and OM4 across large sites and between buildings, fusion spliced or pre-terminated, with Tier 1 loss and Tier 2 OTDR results issued as standard.
FibreLuton · LU1 to LU4
Luton is a genuinely mixed commercial economy — airport and aviation-adjacent operations, the Capability Green and Butterfield business parks, a long-established manufacturing and distribution base, and a town centre under sustained regeneration. Twenty-five minutes up the M1 from our office.
Local context
Airport-adjacent operations, distribution centres and 24-hour manufacturing do not have an out-of-hours window in the way an office does. There is no quiet Sunday, and the planning has to reflect that honestly rather than assuming one exists.
Worth saying plainly
On continuous-operation sites the pressure is always to compress the work into a shift change. A contractor who agrees to an impossible window is not being accommodating; they are transferring the failure risk onto your operations team.
We will tell you before you commit internally, and we will propose a phasing that actually works instead.
Postcodes
LU1 Luton town centre, Capability Green, Airport · LU2 Stopsley, Round Green, Butterfield · LU3 Bramingham, Sundon Park · LU4 Leagrave, Lewsey · LU5 Dunstable and Houghton Regis · LU6, LU7 Dunstable rural and Leighton Buzzard.
Services locally
Fibre
OS2 and OM4 across large sites and between buildings, fusion spliced or pre-terminated, with Tier 1 loss and Tier 2 OTDR results issued as standard.
FibreCopper
Office, warehouse and dock-level copper designed to BS EN 50173-1, with containment fill and PoE thermal performance calculated rather than assumed.
Copper specificationWireless
Scanner, MHE and VoIP coverage validated against loaded racking and real operating conditions, not an empty floor plate.
Wireless designContinuity
Where the operation never stops, UPS classified to BS EN IEC 62040-3 with autonomy sized from measured load, plus maintenance bypass so servicing does not mean an outage.
Cabinets, UPS & powerSmall works
Fixed rate per point*, labelled into your existing scheme, with a test certificate for every point however few.
How MACs workRemediation
Rebuilt live, port by port, with no unplanned loss of service — which on a 24-hour site is the entire requirement.
RemediationQuestions we get asked
By phasing rather than by waiting for a window that does not exist. Each phase has a defined and tested rollback position, so if a stage cannot be completed we return the system to service rather than running over. We plan around shift patterns and agree the phasing before starting, not during.
Yes, subject to the site's own security, pass and induction regime. Those clearances often carry long lead times, so tell us at enquiry stage and we will build them into the programme rather than discovering them at the gate. Our engineers are directly employed, DBS checked and ECS carded.
That is precisely what a live rack remediation is. Full port audit and as-found photographs first, then re-patched port by port to correct lengths with proper management, dead and orphaned links traced and recorded, and the room documented as left with cooling and load reviewed.
Yes — LU5, LU6 and LU7 are within our normal operating area, along with Houghton Regis and the wider South Bedfordshire district.
From the measured load at the cabinet, not from equipment nameplate ratings. Nameplate sizing produces an oversized, expensive unit running inefficiently; optimistic estimating produces one that will not hold the runtime you were promised. We measure, state the topology class under BS EN IEC 62040-3, and tell you in writing what runtime you will actually get — including in year four when the batteries have aged.
Yes. The group holds NICEIC certification directly, so containment, fire stopping, cabinet supplies, distribution, UPS and the electrical elements of a PoE design under BS 7671 Section 716 are delivered and certificated by the same company that installs the cabling.
Luton enquiries